With its modular quick-installation structure and efficient transfer characteristics, the ALYQ90 asphalt mixing plant is particularly suitable for the following typical road construction project scenarios:
Highway Road Development And Construction ProjectsHighway Reconstruction And Expansion ProjectCounty & Township Road Network Upgrade And RenovationForest Fire Prevention Channel Construction ProjectRiverside Flood Control Road Improvement Project
Components Of Mobile Asphalt Mixing Plant
1.Dust Collecting System
Two collecting levels, Gravity dust removal + bag dust removal.
2.Bitumen supply system
Direct heating asphalt tank or thermal oil asphalt tank
3.Mobile chassis
Easy to disassemble and assemble,making asphalt plant is portable and ease of relocation.
4.Drying System
Various fuel options (diesel heavy oil, fine coal, natural gas) to save operating costs;
5.Screening & Mixing System
Screen area increased by 30%, improving work efficiency
6.Aggregate Batching System
The hopper capacity is upgraded to 6.5m³*4, and the belt conveyor is equipped with a pull-rope switch emergency stop device.
Comparative Analysis Of Core Parameters
Parameters
Before Upgrade
New Upgrade
Comparative Analysis
Rated capacity
80 tons/hour
90 tons/hour
112% compliance rate
Actual capacity
72 tons/hour
95 tons/hour
Increase production by 100 tons/day
Transfer time
7 days
24 hours
Efficiency increased by 300%
Mixing technology
twin-shaft mixing
Boiling twin-shaft mixing
uniformity reaches 98%
Foundation Requirements
Concrete foundation
No foundation installation required
Save foundation construction costs
Operators
4 people
2 people
Labor costs reduced by 50%
Formula switching
Manual adjustment (15 minutes)
One-button switching (<1 minute)
Reduced material waste
Fault response
Passive maintenance
Early warning + automatic correction
Downtime reduced by 70%
Project Display
ALYQ90 asphalt mixing plant helps complete the construction of a dedicated transportation road in the mining area 7 days ahead of schedule
Customer Needs
Build a dedicated transportation road network with a total length of 58 kilometers.
Project Challenges
Transfer problems: Traditional asphalt mixing plant take 5 days to transfer to another site, which seriously affects the construction period;
Our Solution
Using a magnetic building block quick-install structure, the transfer time is shortened to 24 hours
No Basic Installation Required
Quick-plug water and electricity system to meet the needs of frequent relocation
Customer Feedback:
Efficiency improvement: The maximum daily output reaches 900 tons, which exceeds expectations by 20%;
Cost savings: Transfer costs are reduced by 67% (3 transfers save a total of 380,000 yuan), and fuel consumption is reduced by 15%;