24-hour Rapid Transfer
100 tons More Production Per Day
24-hour Rapid Transfer
100 tons More Production Per Day


Why Upgrade?
Current Status Of Asphalt Mixing Industry:
Low Production Capacity
The actual production capacity is less than the theoretical capacity, generally only 85%;
Long Installation Cycle
The installation is very slow, and it takes 30 days to complete the installation;
Low Transfer Efficiency
The efficiency of transfer is low, and it takes 7 days to transfer to another place;
Complex Operation
The operation is complicated and AI intelligent operation cannot be performed;
Achieve 100% Efficiency Improvement

PowerKing Mixing System
- Boiling mixing technology: production capacity compliance rate 105%
- Production efficiency increased by 15% (average daily increase of 100 tons)
- Removable cover design, maintenance efficiency increased by 200%
- Blades/liners are free of replacement for 5 years, maintenance costs reduced by 60%

Swarm Control System
- Fully automatic production + electronic inspection + fault warning triple guarantee
- One-click switching of formula, 50% reduction in labor costs (4 people → 2 people)
- Weighing automatic replenishment technology, quality pass rate 100%
- Cloud storage of production data, support remote monitoring/upgrade

AI Precision Metering System
- Spiral frequency conversion control, metering error ≤1%
- Reduces 80 tons of raw material waste per day
- Electronic calibration system, 80% higher calibration efficiency

Quickdraw Intelligent Vibrating Screen
- Patented large channel design, screening efficiency increased by 35%
- Single person quickly replaces screen (100% efficiency improvement)
- 2000-hour maintenance-free motor, 90% lower failure rate
Achieve 24-hour Rapid Transfer
Transition efficiency increased by 300%
Basic cost saved by 100%

In Stock and Ready. Tour Our Factory to Verify Build Quality
ALYQ90 Mobile Asphalt Batch Mixing Plant
- Productivity: 80t/h-96 t/h
- Cold Aggregate bin: 6.5m³
- Dust removal: Gravity dust removal + bag dust removal
- Aggregate elevator: 100t/h
- Hot aggregate bin: 4 bins, 10m³ (15t)
Application: multiple construction sites need to take turns to construct, emergency road repair, temporary road construction, etc.
Get Quote Now >

Application of the ALYQ90
With its modular quick-installation structure and efficient transfer characteristics, the ALYQ90 asphalt mixing plant is particularly
suitable for the following typical road construction project scenarios:





Components Of Mobile Asphalt Mixing Plant

Dust Collecting System
Two collecting levels, cyclone dust filter and Bag dust filter.
Bitumen supply system
Direct heating asphalt tank or thermal oil asphalt tank
Mobile chassis
Easy to disassemble and assemble,making asphalt plant is portable and ease of relocation.
Drying System
Various fuel options (diesel heavy oil, fine coal, natural gas) to save operating costs;
Aggregate Batching System
The hopper capacity is upgraded to 6.5m³*4, and the belt conveyor is equipped with a pull-rope switch emergency stop device.
Screening & Mixing System
Screen area increased by 30%, improving work efficiency
Comparative Analysis Of Core Parameters
Parameters | Before Upgrade | New Upgrade | Comparative Analysis |
---|---|---|---|
Rated capacity | 80 tons/hour | 90 tons/hour | 112% compliance rate |
Actual capacity | 72 tons/hour | 95 tons/hour | Increase production by 100 tons/day |
Transfer time | 7 days | 24 hours | Efficiency increased by 300% |
Mixing technology | twin-shaft mixing | Boiling twin-shaft mixing | uniformity reaches 98% |
Foundation Requirements | Concrete foundation | No foundation installation required | Save foundation construction costs |
Operators | 4 people | 2 people | Labor costs reduced by 50% |
Formula switching | Manual adjustment (15 minutes) | One-button switching (<1 minute) | Reduced material waste |
Fault response | Passive maintenance | Early warning + automatic correction | Downtime reduced by 70% |
Project Display
ALYQ90 asphalt mixing plant helps complete the construction of a dedicated transportation road in the mining area 7 days ahead of schedule




Customer Needs
Build a dedicated transportation road network with a total length of 58 kilometers.
Project Challenges
Transfer problems: Traditional asphalt mixing plant take 5 days to transfer to another site, which seriously affects the construction period;
Our Solution
- Using a magnetic building block quick-install structure, the transfer time is shortened to 24 hours
- No Basic Installation Required
- Quick-plug water and electricity system to meet the needs of frequent relocation
Customer Feedback:
- Efficiency improvement: The maximum daily output reaches 900 tons, which exceeds expectations by 20%;
- Cost savings: Transfer costs are reduced by 67% (3 transfers save a total of 380,000 yuan), and fuel consumption is reduced by 15%;
Patent Certification

Other Related Products For Road
Construction Projects

Asphalt Batching Mix Plant

Asphalt Drum Mixing Plant

Mobile Asphalt Drum Mixing Plant